Ruslan VasylevPrincipal software engineer← Augrade in the work reference

BIM · modeling + coordination

Augrade

Ruslan Vasylev · Senior Software Engineer · Jun 2024–Aug 2025

At Augrade, I owned the web UI and 3D viewer, including design and implementation, to help general contractors inspect models and communicate required corrections to specialist subcontractors. The work includes model interaction, worker-based clash review and local BCF issue creation; remote ticket synchronization is not verified.

Projects

What did the work involve?

Who is it for?

Operator
General contractor coordinating the project
Audience
Specialist subcontractors responsible for model corrections

What did I contribute?

Ownership
Whole web UI and 3D viewer · product design and implementation · prioritization
Impact
Customers used the product; use of individual feature slices is not separately established.
Delivery
IFC loading, model interactions, caching, clash detection and local BCF issue creation were implemented; deployment of those features is unverified.

How does it work?

Workflow
Load and inspect models → identify coordination conflicts → select findings → create local BCF issues for correction discussions

How did a general contractor review models and corrections?

Model assembly

Modeling prototypeBrowser model assembly and caching

I added IFC loading to the existing viewer and developed the browser model-loading path. The loading path reconstructs interactive IFC fragments and caches model bytes with version/checksum metadata and invalidation.

  • Existing GLB path → direct IFC loading
  • ThatOpen/web-ifc → fragments and interactive models
  • Browser Cache Storage · checksum/version metadata · validation

Technologies IFC · web-ifc · WebGL · GLB · ThatOpen · Cache Storage

In the work reference

Client-side model assembly

Modeling prototypeBrowser modeling path

I got the browser modeling path working, with models assembled on the client.

  • Models assembled on the client
  • Result · working modeling prototype
In the work reference

Design and delivery priorities

Viewer product design, implementation and prioritization

I owned the viewer’s design and implementation and prioritized what general contractors needed, translating their coordination tasks into model interactions and review workflows.

  • Owned design and implementation
  • Prioritize general-contractor needs
  • Coordinate inspection and correction communication before construction

Limits Preventing downstream conflicts and rework is the intended purpose; this account does not establish a measured safety or rework-reduction result.

In the work reference

Model editing

Modeling prototypeBrowser-side geometry editing

I developed browser-side geometry interactions, including vertex tools, multi-selection and model-instance transforms, and connected editing state to the application’s model data.

  • Vertex · edge · polygon interactions
  • BIM properties · measurement tools
  • IFC + custom model schemas

Technologies IFC

In the work reference

Selection + measurements

Modeling prototypeViewer interactions and measurement integration

I integrated selection, transforms and library-backed measurement tools into the BIM viewer so the general contractor could inspect geometry while discussing corrections.

  • Element selection · highlighting
  • Translate · rotate · scale model instances
  • Distance · edge length · area · volume · angles

Collaboration Measurement tools use ThatOpen components; not all of their initialization code is mine.

Technologies Three.js · IFC · ThatOpen

In the work reference

Building data in GIS context

DeliveredBuilding visualization and property-editing workflow

The application placed BIM and building data in GIS context for planning and design decisions. I built browser visualization and property-editing interactions.

  • BIM / IFC geometry within GIS context
  • Building properties · design options
  • Browser visualization for planning and design decisions

Limits The delivery claim covers broader building/GIS visualization and property-editing work; it does not establish deployment or customer use of the particular viewer, clash or BCF revisions.

Technologies IFC

In the work reference

Converted-model input

Browser model assembly and editing

My part was browser assembly and editing of the conversion pipeline’s output. I did not author or own the geometry kernel, or own the backend APIs.

  • Input · converted CAD / Revit models
  • My slice · browser assembly + editing
In the work reference

Worker-based mesh clash detection

ImplementedBrowser clash engine, worker integration and rule-based review

I developed a browser clash-detection path that sends geometry and instance transforms to a worker, builds BVHs and returns intersections for semantic and rule filtering. General contractors can review the resulting conflicts and select findings for local BCF issue creation. This is mesh-based analysis using Three.js and three-mesh-bvh.

  • Serialize meshes and instance transforms to a Web Worker
  • Build mesh BVHs and test intersections
  • Semantic/rule filtering → reviewable clash results
  • Progress, cancellation and worker cleanup

Limits Runtime correctness, numerical accuracy, deployment and feature-level customer use are not verified.

Technologies Three.js · three-mesh-bvh · Web Workers

In the work reference

BCF ticket persistence

Partial deliveryTicket UI and local persistence; backend handoff

I built the BCF ticket UI and local persistence so model findings could be retained for coordination discussions. The implementation stores topics, comments, viewpoints and relations in IndexedDB and supports BCF file import/export. I also worked on backend handoff, but a complete remote submission and retrieval roundtrip is not verified.

  • BCF topics · comments · viewpoints · element relations
  • IndexedDB CRUD and clash-to-topic mappings
  • BCF ZIP/XML import and export
  • Backend handoff reported; remote synchronization unverified

Limits Remote synchronization, arbitrary model-revision preservation and deployment are unverified.

Technologies BCF · IndexedDB

In the work reference

Clash review and local issue creation

Partial deliveryClash-review UI and local BCF issue-creation integration

The general contractor uses model conflicts to identify corrections to discuss with specialist subcontractors before construction. The integration converts selected clashes into local BCF issues, records element/rule identities and handles partial creation failures.

  • General contractor reviews model conflicts for subcontractor corrections
  • Selected clashes → stable IDs → BCF topics
  • Partial-create failures → keep successes or roll back
  • Remote synchronization and deployed revision unverified

Limits Local clash-to-BCF creation is implemented; deployed/customer-used feature scope and the complete remote lifecycle are unverified.

Technologies BCF · IndexedDB

In the work reference

What connected the browser to model services?

UI ↔ model records

Frontend model-record mapping and change interactions

I worked on how IFC and custom schemas map into the UI and how model changes move back into backend records.

  • IFC + company-specific schemas → UI
  • Model changes ↔ backend records

Technologies IFC

In the work reference